Changes for page Failover - Deploy Possibilities
Last modified by Erik Bakker on 2024/09/27 14:07
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -18,11 +18,11 @@ 18 18 19 19 == 3.1 Settings == 20 20 21 -After finishing up your configuration in the Design phase, you can then go to the Settings page on the top right corner of the Create phase. In this page, under the "Failover systems" tab in the "Transfer settings from design" section, you will find the system connector(s) that you can transfer the failover settings from Design. 21 +After finishing up your configuration in the Design phase, you can then go to the Settings page on the top right corner of the Create phase. In this page, under the "Failover systems" tab in the "Transfer settings from design" section, you will find the system connector(s) that you can transfer the failover settings from Design. Please check the screenshot below as an example. 22 22 23 23 [[image:Main.Images.Microlearning.WebHome@grouping-and-failover--intermediate-grouping-and-failover-setting-up-failover-create-phase-create-settings.png]] 24 24 25 - {{info}}Systemswiththe failoveroption enabledmust have"Number ofruntimes"exactly2andmustbeplacedonan externalmachineintheArchitecturepanel.{{/info}}25 +By pressing the "Transfer failover" button, eMagiz will regenerate the connector infra of that system as well as update the exit and entry flows connected to that system with the required settings. 26 26 27 27 == 3.2 Design Architecture == 28 28