Changes for page R21 Docker - Double Lane
Last modified by Erik Bakker on 2026/06/16 11:56
From version 34.1
edited by Erik Bakker
on 2026/06/16 11:56
on 2026/06/16 11:56
Change comment:
There is no comment for this version
To version 16.1
edited by CarlijnKokkeler
on 2023/11/21 11:51
on 2023/11/21 11:51
Change comment:
There is no comment for this version
Summary
-
Page properties (3 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -R 21 Docker - Double Lane1 +R13 Docker - Double Lane - Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. ebakker1 +XWiki.CarlijnKokkeler - Content
-
... ... @@ -1,21 +1,24 @@ 1 - {{info}}Thisenvironment template needs to be appliedon all environmentsofall(your)modelsbefore August15th, 2026{{/info}}1 +Service affecting template that introduces faster machine boot up and improved auto-healing. 2 2 3 -**Non-service affecting** final template to use the **R21** double lane release. This is the only step for your upgrade to the new **R21** template. 4 - 5 5 **Process** 6 -We upgrade in o nestep to use the new**R21**release of the cloud template.This step is non-service affecting.4 +We upgrade in two steps to use the new R13 release of the cloud template. Of these two steps, the intermediate step is non-service affecting, and the final step is service affecting. 7 7 8 8 **Overview** 9 -* Upgrade cloud environment to prepare for IP address migration. 10 -* Update authorization server to enable future certificate rotations. 7 +This version contains performance improvements for auto-healing and machine boot up time. 11 11 9 +**Updates** 10 +* Ubuntu version update including latest security patches. 11 +* This upgrade is service-affecting, as all instances have to be recreated. 12 + 12 12 **Update Steps** 13 -* Use the final**R21**template (non-service affecting) (duration: 10 minutes)14 -** Noneoftheruntimeswillbetouched.14 +* Use the intermediate template (non-service affecting) (duration: 10 minutes) 15 +** This step will upgrade the backup machines hosted in the second Availability Zone in your Cloudslot. 15 15 ** The network drive containing the Artemis queue store and your Elastic IPs will remain. 16 -** Authorization servers will perform a rolling update. 17 -* User actions after applying the intermediate template: 18 -** Check if all runtimes are reachable by the runtime dashboard 19 -** Check if all flows have been installed according to the active release 20 -** Check if messages pass through the bus by verifying a critical message flow in external systems 17 +* Use the final template (service affecting) (duration: 10 minutes) 18 +** This step will upgrade the primary machines in the first Availability Zone in your Cloudslot. 19 +** The runtimes on the machines will be restored using the active release in the eMagiz portal. 20 +* User actions after applying the final template: 21 +** Check if all runtimes are reachable by Deploy Architecture. 22 +** Check if all flows have been installed according to the active release. 23 +** Check if messages pass through the model by verifying a critical message flow in external systems. 21 21