Changes for page R21 Docker - Double Lane
Last modified by Erik Bakker on 2026/06/16 11:56
From version 34.1
edited by Erik Bakker
on 2026/06/16 11:56
on 2026/06/16 11:56
Change comment:
There is no comment for this version
To version 14.1
edited by Erik Bakker
on 2023/08/03 16:16
on 2023/08/03 16:16
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -R 21 Docker - DoubleLane1 +R10 Docker - Double lane - Content
-
... ... @@ -1,21 +1,19 @@ 1 - {{info}}Thisenvironment template needs to beappliedonall environmentsofall (your)models before August15th,2026{{/info}}1 +Non-service affecting R10 template that unlocks the possibility of running a failover configuration on an MQTT Broker. 2 2 3 -**Non-service affecting** final template to use the **R21** double lane release. This is the only step for your upgrade to the new **R21** template. 4 - 5 5 **Process** 6 -We upgrade in one step to use the new **R21**release of the cloud template. This step is non-service affecting.4 +We upgrade in one step to use the new R10 release of the cloud template. This step is non-service affecting. 7 7 8 8 **Overview** 9 -* Upgrade cloud environment to prepare for IP address migration. 10 -* Update authorization server to enable future certificate rotations. 7 +It adds the possibility of hosting an MQTT broker in a failover setting. 11 11 9 +**Updates** 10 +* Run an MQTT broker in a failover setting 11 + 12 12 **Update Steps** 13 -* Use the final **R21** template (non-service affecting) (duration: 10 minutes) 14 -** None of the runtimes will be touched. 15 -** The network drive containing the Artemis queue store and your Elastic IPs will remain. 16 -** Authorization servers will perform a rolling update. 17 -* User actions after applying the intermediate template: 18 -** Check if all runtimes are reachable by the runtime dashboard 19 -** Check if all flows have been installed according to the active release 20 -** Check if messages pass through the bus by verifying a critical message flow in external systems 13 +* Use the final template (non-service affecting) (duration: 10 minutes) 14 +** This step will update your cloud slot configuration to allow an MQTT broker with failover settings. 15 +* User actions after applying the final template: 16 +** Check if all runtimes are reachable by Deploy Architecture. 17 +** Check if all flows have been installed according to the active release. 18 +** Check if messages pass through the model by verifying a critical message flow in external systems. 21 21