Changes for page R21 Docker - Double Lane
Last modified by Erik Bakker on 2026/06/16 11:56
From version 15.1
edited by Erik Bakker
on 2023/09/13 07:27
on 2023/09/13 07:27
Change comment:
There is no comment for this version
To version 33.1
edited by Erik Bakker
on 2026/06/15 09:37
on 2026/06/15 09:37
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -R1 1Docker - Doublelane1 +R21 Docker - Double Lane - Content
-
... ... @@ -1,24 +1,21 @@ 1 - Service affectingR11templatethat improvesstabilityofAWSEFS mountsinrunning instanceswhena reconnecttoEFS is triggered.1 +{{info}}This environment template needs to be applied on all environments of all (your) models before August 15th, 2026{{/info}} 2 2 3 +**Non-service affecting** final template to use the **R21** double lane release. This is the only step for your upgrade to the new **R21** template. 4 + 3 3 **Process** 4 -We upgrade in two stepsto use the new R11release of the cloud template.Of thesetwosteps,theintermediatestepisnon-service affecting, and the final step is service affecting.6 +We upgrade in one step to use the new **R19** release of the cloud template. This step is non-service affecting. 5 5 6 6 **Overview** 7 -It improves the stability of the AWS EFS mounts in running instances when a reconnect to EFS is triggered. 9 +* Upgrade cloud environment to prepare for IP address migration. 10 +* Update authorization server to enable future certificate rotations. 8 8 9 -**Updates** 10 -* Updated mount configurations of EFS to adhere to provider's standards. 11 -* Ubuntu version update including latest security patches. 12 -* This upgrade is service-affecting, as all instances have to be recreated. 13 - 14 14 **Update Steps** 15 -* Use the in termediatetemplate (non-service affecting) (duration: 10 minutes)16 -** This step will upgrade the backup machines hosted in the second Availability Zone in your Cloudslot.13 +* Use the final **R19** template (non-service affecting) (duration: 10 minutes) 14 +** This step will upgrade the backup machines hosted in the second Availability Zone in your cloudslot. 17 17 ** The network drive containing the Artemis queue store and your Elastic IPs will remain. 18 -* Use the final template (non-service affecting) (duration: 10 minutes) 19 -** This step will update your cloud slot configuration to allow an MQTT broker with failover settings. 20 -* User actions after applying the final template: 21 -** Check if all runtimes are reachable by Deploy Architecture. 22 -** Check if all flows have been installed according to the active release. 23 -** Check if messages pass through the model by verifying a critical message flow in external systems. 16 +** The runtimes on the machines will be restored using the active release in the eMagiz portal 17 +* User actions after applying the intermediate template: 18 +** Check if all ".02" runtimes are reachable by the runtime dashboard 19 +** Check if all flows have been installed according to the active release 20 +** Check if messages pass through the bus by verifying a critical message flow in external systems 24 24